The vapor barrier is placed between layers of sand before concrete is poured.

Video detailed description:
The only trenches remaining are those for foundation footings, designed in accordance with the structural and geotechnical consultants. A vapor barrier is placed as specified in the plans and as required by the prevailing building codes.

left arrow Last:
All the below-grade plumbing components are in place and ready for inspection.
  Next:
Install rebar before pouring concrete for a structurally sound foundation.
arrow right