UNIT 4: Walls are painted, bathroom tile for the tub/shower surrounds are in, and cabinets are in place.

Video detailed description:
UNIT 4: The rough stucco is on, with finish to be applied in a couple weeks. Bit of Sugar is the color white for interior paint, and bathroom tiles are porcelain, which comes in a variety of styles allowing for creative design. Cabinets are installed and countertops are in fabrication.

left arrow Last:
UNIT 2: The finished interior atmosphere is determined in part by material selections for kitchens and baths.
  Next:
Paint and stucco are at completion phase, water and gas utilities are prepped for connection to building.