Paint and stucco are at completion phase, water and gas utilities are prepped for connection to building.

Video detailed description:
Drywall is done and painted. Baseboards, trim and casings are painted and being touched up. Stucco is complete. Trenches for water and gas utility connections on site are being dug. Grading has begun for landscaping.

left arrow Last:
UNIT 4: Walls are painted, bathroom tile for the tub/shower surrounds are in, and cabinets are in place.
  Next:
All units are essentially complete. The landscape work is being done, but has seen delays due to the rain.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 