sequentRealtyHeader

 
Video quick synopsis:
Exterior is wrapped with waterproof paper in preparation for stucco.

Video detailed description:
The construction is wrapped with paper and wire prior to stucco. There will be a few different colors and textures to define certain forms and elements. At the interior, the La Cantina four-panel slider is being prepped for installation.

left arrow Last:
Custom windows are a key detail that sets the project apart from a spec structure.
  Next:
Insulation is in place in walls and ceilings, and drywall is beginning to cover it.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 
bar1
bar2
bar3
bar4
bar5
bar6
bar7
 
Binvetec Design | Rights Reserved