sequentRealtyHeader

 
Video quick synopsis:
Insulation is in place in walls and ceilings, and drywall is beginning to cover it.

Video detailed description:
The pink stuff, scratch that, the beige stuff is in the walls and ceiling (ok, so sometimes it's indeed pink), which provides both thermal and acoustical performance. The drywall hanging has begun, and some walls are treated for fire and sound resistance.

left arrow Last:
Exterior is wrapped with waterproof paper in preparation for stucco.
  Next:
The finished interior atmosphere is determined in part by material selections for kitchens and baths.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 
bar1
bar2
bar3
bar4
bar5
bar6
bar7
 
Binvetec Design | Rights Reserved