Video quick synopsis:
Dropping in drain pipes and having a surveyor locate the building corners.

Video detailed description:
Now that the building pads are compacted and level at the right elevation, we're dropping in drain pipes while there's plenty of room on the site. The pipes won't need to carry much rainwater because we're using permeable pavers and rainwater collection barrels. A surveyor locates the building corners to prep for the foundation footings.

left arrow Last:
During excavation, soils tests are conducted prior to recompaction. Various machines make it happen.
  Next:
Chalk lines define where trenches are dug for footings and sewer lines.