sequentRealtyHeader

 
Video quick synopsis:
Chalk lines define where trenches are dug for footings and sewer lines.

Video detailed description:
Prior to digging footing and sewer trenches, guide lines and chalk lines are used to delineate precisely where to do the work. It's important to plan where the sewer line from the existing duplex will connect to the new line for the new duplex as it heads to the street main.

left arrow Last:
Dropping in drain pipes and having a surveyor locate the building corners.
  Next:
Trenches are prepared for foundation footings and sewer lines.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 
bar1
bar2
bar3
bar4
bar5
bar6
bar7
 
Binvetec Design | Rights Reserved