Video quick synopsis:
First floor framing nears completion while new water and sewer connections to the main are prepared.

Video detailed description:
As first floor framing nears completion, the new water meter connections to the street and sewer connection at the main get underway. There are two spaces on the first floor that have a double-height ceiling, which requires balloon framing. As the ceiling joists are placed, preparations for second floor framing can begin.

left arrow Last:
The first floor framing begins once the concrete cures, and 2x6 members are the major players.
  Next:
The ceiling of the first level is the floor of the second level, so the floor joists are visible from below.