Video quick synopsis:
The first floor framing begins once the concrete cures, and 2x6 members are the major players.

Video detailed description:
Once the concrete foundation has cured, it's time to start putting up the walls. 2x6 lumber is used for all exterior walls, shear walls, and heavy load bearing walls. Wood construction is flexible in that it allows for minor adjustments during the framing process. As walls rise, spaces and openings start taking shape.

left arrow Last:
Due to concrete's time-sensitive nature, the crew must be dialed in for foundation perfection.
  Next:
First floor framing nears completion while new water and sewer connections to the main are prepared.