sequentRealtyHeader

 
Video quick synopsis:
Framing has continued, but in the meantime there was a fire followed by rainfall.

Video detailed description:
In an unexpected turn of events, a 20's something individual ignited a fire on the third floor. The neighbors used a hose to reduce damage until the fire department arrived. A week later rains drenched the site.

left arrow Last:
Almost every wall has been framed, and the roof rafters will be next.
  Next:
With framing complete, the plumber and electrician send their pipes and wires through the walls.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 
bar1
bar2
bar3
bar4
bar5
bar6
bar7
 
Binvetec Design | Rights Reserved